The subject plant is located in district of and falls under NIC Category-13131. This assessment was carried out by the IEAC Center, IIT Madras, during the course of the year 2023.

General Info

Principal Product

Socks

Plant Area (Sq.ft)

10,000

No. of Employees

Production Hours

7,200

Annual Production

39,00,000

Annual Sales

₹78,40,00,000

Assessment Summary

Total Energy Costs(per year)

₹11,97,06,984

Total Recommended Investment(one time)

₹9,00,000

Total Recommended Savings(per year)

₹49,83,922

Energy Costs Calculation
Electricity

Annual Usage

97,91,544

Unit

kWh

Unit Cost

₹11

Annual Cost

₹10,77,06,984

Wood

Annual Usage

30,00,000

Unit

kg

Unit Cost

₹4

Annual Cost

₹1,20,00,000

Total Energy Costs(per year)

₹11,97,06,984

Observations & Recommendations
BR - Boiler & Steam Line
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Condensate recovery is very lessMaximize Condensate Return15,217₹60,868₹30,0005.9
High Feed water TDSTest and Treat Boiler Water on a Continuing Basis126783₹5,07,132₹1500003.5
Poor Thermal InsulationLocate and Repair Defective Insulation on All Heating Plant Equipment and Piping15,217₹60,868₹20,0003.9
CR - Compressor
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
High Air LeakageEliminate leaks in inert gas and compressed air lines/ valves2,69,914₹29,69,054₹2,00,0000.8
Higher than the machine required pressureReduce air compressor discharge pressure to the lowest acceptable setting.((Reduction of 1 kglcm2 air pressure (8 kg/cm2 to 7 kg/cm2 ) would result in 9% input power savings.87297₹0
HF - Humidification Plant
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Improper maintenanceExhaust filters must be cleaned at least once a day and in case of louver & eliminator sheet, the cleaning should be done based on the drop in air volume in the department126000₹13,86,000₹5000004.3
MT - Motors
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
High Motor speedUse adjustable frequency drive or multiple speed motors on existing system54000₹0