EAR/22-23/KISEM-IITGN-06

The subject plant is located in Ahmedabad district of Gujarat and falls under NIC Category-20. This assessment was carried out by the IEAC Center, IIT Gandhinagar, during the course of the year 2023.

General Info

Principal Product

Dyes & Intermediates

Plant Area (Sq.ft)

1,00,000

No. of Employees

350

Production Hours

7,200

Annual Production

Annual Sales

₹5,00,00,000

Assessment Summary

Total Energy Costs(per year)

₹1,06,07,036

Total Recommended Investment(one time)

₹94,290

Total Recommended Savings(per year)

₹4,64,546

Energy Costs Calculation
Electricity

Annual Usage

5,11,260

Unit

kWh

Unit Cost

₹8

Annual Cost

₹39,53,974

Gas

Annual Usage

82,749

Unit

SCM

Unit Cost

₹81

Annual Cost

₹66,53,062

Total Energy Costs(per year)

₹1,06,07,036

Observations & Recommendations
TR - Transformer
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Power factor at LT side during load time is 0.74Install a fixed capacitor of 20 kVAR₹6,290
BR - Boiler & Steam Line
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Some Hydrogen (ppm) traces reflect in flue gas due to frequent burner on and offFrom On Off operation switch to low-high modulation7
High excess air in the systemFirst modulate the burner and then again check the excess air4061₹2,88,3627
Heat loss from flue gas duct & supply line from APH to blower (Air preheater)Proper insulation is required2481₹1,76,184₹70,0005
CPF - Capacitor & Power Factor
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
3 capacitor of 15 kVAR are derated (APFC)Replace all the derated capacitor₹12,000
2 capacitor of 10 kVAR are derated (APFC)Replace all the derated capacitor₹6,000