KMB-IIT-GN-16.11.22-01

The subject plant is located in district of and falls under NIC Category-37003. This assessment was carried out by the IEAC Center, IIT Gandhinagar, during the course of the year 2022.

General Info

Principal Product

Common Effluent Treatment

Plant Area (Sq.ft)

20,000

No. of Employees

250

Production Hours

8,400

Annual Production

5,21,10,400

Annual Sales

₹95,81,20,000

Assessment Summary

Total Energy Costs(per year)

₹32,07,27,746

Total Recommended Investment(one time)

₹30,70,365

Total Recommended Savings(per year)

₹3,11,23,815

Energy Costs Calculation
Electricity

Annual Usage

1,18,37,400

Unit

kWh

Unit Cost

₹9

Annual Cost

₹10,67,20,746

Coal

Annual Usage

2,14,00,700

Unit

kg

Unit Cost

₹10

Annual Cost

₹21,40,07,000

Total Energy Costs(per year)

₹32,07,27,746

Observations & Recommendations
MT - Motors
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Dissolved Oxygen level in aeration unit is greater than the standard decided by GPCBStop the 5-aerator motor and its blower keeping all the parameter as per GPCB norm (for saving calculation we only consider that blowers will remain stop for 18 hours/day)10,73,023₹96,57,2070
Excess Air in Spray Dryer 3Optimize the flow by taking input to Flue gas Analyzer. Power Saving in FD fan 1 & 2 by optimizing the flow of air (already connected with VFD)25,920₹2,33,280₹00
Scrubber Water pump running on under load (25%) for Spray Dryer 1 (15 kW motor)Check the nozzle opening and do cleaning after that if it is taking less power, it is recommended to use VFD or to go with delta to star connection to reduce the power consumption (Rated kW:15 kW motor and Actual kW:5.5 kW )0₹0₹11000
Excess air at Spray Dryer-1Power Saving in FD fan by optimizing the flow of air (Use VFD), use VFD at 45 Hz and optimize it (Motor+VFD) (Motor Rated P=75kW, Actual power=51.6kW)1,20,960₹10,88,640₹5000006
Excess air at Spray Dryer-1Power Saving in SFD fan by optimizing the flow of air (Use VFD) (Motor Rated P=18.5kW, Actual power=11 kW34,560₹3,11,040₹1,50,0006
BR - Boiler & Steam Line
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Surface Temperature at some points are higher than allowable temperature in spray dryer 1Proper Insulation Required87,120₹8,71,200₹2,50,0004
Surface Temperature at some points are higher than allowable temperature in spray dryer 3Proper Insulation Required7,92,000₹79,20,000₹7,00,0001
Excess air inside the Combustion chamber -Spray Dryer-1Use Oxygen Analyzer and give its feedback to control Forced draft fan speed by using VFD7,92,000₹79,20,000₹5,00,0001
Excess air inside the Combustion chamber -Spray Dryer-3Use Oxygen Analyzer and give its feedback to control Forced draft fan speed by using VFD2,37,600₹2376000₹5000003
CPF - Capacitor & Power Factor
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Some of the aerator capacitors are derated (Floating Aerator 3, Aerator motor 17,18,19 and aerator blower 16,17,18,19Need to change the derated capacitor to improve PF for specific motor and decrease the load current₹32,000
Collection tank pump all seven pumps’ capacitors are deratedNeed to change the derated capacitor to improve PF for specific motor and decrease the load current₹14,000
Fixed capacitor and APFC 2500 kVAr transformer ,6 capacitors are deratedNeed to change the derated capacitor to improve PF₹33,000
APFC, 2500 kVAr transformer ,3 capacitors are deratedNeed to change the derated capacitor to improve PF₹14,000
DM - Demand Management
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
High Contract DemandCase 1: Reduced Contract Demand to 2000 kW from 2500 kW. Since Oct-21 the average demand is 1750kW but as per norms billing demand is 2125 kW at 2500 kW1500₹5,77,500₹2,67,3656
TOU load is 35%Time of Usage (Shifting the peak time load to night) (Final pumping station pumps and borewell and Raw water pump) for 4 hours (Total Power cons. 90.25kW)129960₹1,29,960
TOU load is 35%Night Concession (30 paise per unit)129960₹38,988