The subject plant is located in district of and falls under NIC Category-52101. This assessment was carried out by the IEAC Center, IIT Gandhinagar, during the course of the year 2022.

General Info

Principal Product

Cold Storage

Plant Area (Sq.ft)

2,00,000

No. of Employees

300

Production Hours

8,400

Annual Production

Annual Sales

₹1,00,00,000

Assessment Summary

Total Energy Costs(per year)

₹38,14,435

Total Recommended Investment(one time)

₹14,40,000

Total Recommended Savings(per year)

₹8,45,282

Energy Costs Calculation
Electricity

Annual Usage

5,48,051

Unit

kWh

Unit Cost

₹6.96

Annual Cost

₹38,14,435

Total Energy Costs(per year)

₹38,14,435

Observations & Recommendations
MT - Motors
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Compressor Motors taking more power when there is partial loading on compressorUse VFD with the motor reduce the power consumption (Motor rated-55 kW)-Avg. Running Time : 24hrs for 2 months14,633₹1,02,431₹1,75,00021
Compressor Motors taking more power when there is partial loading on compressorUse VFD with the motor reduce the power consumption (Motor rated- 55kW)-Avg. Running Time : 24 hrs for 2 months12,185₹85,295₹1,75,00025
Compressor Motors taking more power when there is partial loading on compressorUse VFD with the motor reduce the power consumption (Motor rated- 75kW)-Avg. Running Time : 20 hrs for 4 months24,548₹1,71,836₹2,10,00015
Compressor Motors taking more power when there is partial loading on compressorUse VFD with the motor reduce the power consumption (Motor rated- 90kW)-Avg. Running Time : 20 hrs for 4 months31,599₹2,21,193₹2,50,00014
TR - Transformer
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Current Harmonics are more than the standard limit (7th & 5th)Install Active Harmonic filterLife cycle of Equipment will improve₹0₹5,00,0000
CT - Cooling Tower
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Algae Formation over the cooling pipelineRemove the algae from pipe by painting of pipe and use chemical to reduce the formation of algae and also do proper cleaning of pipe and check the nozzle opening and proper water spray from nozzle (by reducing 1 deg C)6995.28₹48967₹30,0007
High TDS water (Cooling Tower Sump)Maintain TDS level of cooling tower sump water helps in reduction of nozzle clogging (Blow down properly)0₹0₹00
CHR - Chiller
ObservationRecommendationUnit SavingsAnnual SavingsInvestmentROIStatus
Losses due to insulationNeed to do proper insulation on pipeline30794₹2,15,560₹1,00,0006